Our project numbers

Windposts removed
Lintels replaced
Lm of fire boarding removed

 

KEY FACTS
  • Masonry Contractor: Elliott Brickwork
  • Main Contractor: Buckingham Group
  • Architect: Faulkner Browns
  • Structural Engineer: Engenuiti
  • Client: Coventry City Council

PROJECT INFORMATION

The curved shape of this leisure centre posed major architectural and engineering challenges for all involved. Designed by Engenuiti, the Wi system was used to create the inner circle of walls. The system also played a part in forming a continuous wall for the squash courts which required a continuous surface with no joints, one of the key benefits of the Wi beams.

 

Other Projects